End Plug 110mm Jack Mount

End Plug 110mm Jack Mount

 Heavy-Duty Duct Closure & Sealing Plug for Telecom, Fiber & Underground Utilities in Saudi Arabia & Gulf Region

image

Why the End Plug 110mm Jack Mount Is Important

The exposure of open conduit to the air and the environment makes the systems prone to:

  • Water and moisture entry
  • Soil, sand, and debris infiltration
  • Rodent and insect ingress
  • Cable damage during installation
  • Oxidation and corrosion
  • Installation delays and rework

However, installing a good quality end plug right after trenching, drilling, or jack mounting not only secures against these dangers but also guarantees that cable installation, fiber pulling, and network integrity go on without a hitch.

 

Key Features of End Plug 110mm Jack Mount

  • Precision designed for 110mm duct inner diameter
  • Durable and impact-proof made up
  • Protected from weather, dust, and moisture
  • Simple push-fit or lock-in installation
  • Fits jack mount and pulled duct installations
  • Applicable for permanent and temporary sealing
  • Based on variant, either reusable or single use
  • Tolerant to soil chemicals and environmental stress

Technical Specifications – End Plug 110mm Jack Mount

SpecificationDetail
Product NameEnd Plug 110mm Jack Mount
Compatible Duct Size110 mm diameter
MaterialHDPE / Polypropylene / Rubber EPDM
ColorBlack / Natural
Installation TypePush-fit / Mechanical locking
Operating Temp-20°C to +80°C (material dependent)
Moisture ResistanceExcellent
UV ResistanceYes
Chemical ResistanceGood (soil salinity, mild chemicals)
ReusabilityYes (depending on design)
ApplicationTelecom, fiber, power, utilities

Materials & Construction

The End Plug 110mm Jack Mount is usually made of the durable and high-impact polymer plastics such as:

  • HDPE (High-Density Polyethylene)
  • grate resistance to moisture
  • toughness under pressure
  • very long lifetime
  • Polypropylene (PP)
  • fairly good structural integrity
  • toughness against chemicals
  • Elastomeric / Rubber (EPDM) Seals
  • better sealing efficiency
  • compression fit for impermeable closure

These are the materials chosen for the reason that they could resist tough, buried conditions along with temperature changes, chemical in soil, and mechanical impact.

How End Plug 110mm Jack Mount Is Used

Typical Installation Steps

  1. Prepare the Duct End
    Ensure the 110mm duct end is clean and smooth.

  2. Inspect the Plug
    Check that the plug matches the duct diameter and inspect for any defects.

  3. Insert the Plug
    Align the plug and press it into the duct until it is fully seated. Push-fit or locking mechanisms will secure it in place.

  4. Verify the Seal
    Confirm that the plug sits flush and creates a snug, sealed interface.

  5. Backfill and Compact
    After sealing, backfill the trench or hole per project specifications.

  6. Re-Entry (If Required)
    Some plug designs allow for removal prior to cable pulling and then reseating after installation.

Applications – Where End Plug 110mm Jack Mount Is Used

Telecom & Fiber Optic Networks

Essential for sealing ducts during fiber deployment, especially in FTTH, FTTx, and backbone fiber networks.

Underground Power Ducts

Used to protect power cable conduits before and after pulling.

Utility Corridors

Provides organization and protection in shared utility trenches.

Directional Drilling & Trenchless Installations

Commonly used in jack and bore methods to seal entry or exit pits.

Industrial & Data Center Infrastructure

Seals cable access points for industrial control and communications lines.

Smart City Deployments

Secures conduit ends in sensor networks, urban networks, and digital utility grids

Benefits of Using End Plug 110mm Jack Mount

1. Effective Environmental Protection

Seals conduits against intrusion of water, dust, sand, rust, rodents, and insects.

2. Maintenance of Cable Pathway Cleanliness

Facilitates smooth cable pulling operations by ensuring ducts are always clear.

3. Enhanced Installation Efficiency

Eliminates rework caused by duct contamination.

4. Long-Term Infrastructure Reliability

Increases the durability and functionality of underground systems.

5. Reduced Operational Costs

Decreases repair, downtime, and maintenance costs of cables.

6. Simple, Tool-Free Installation

Push-fit variations are time and labor efficient.

Types and Variants

Push-Fit End Plugs

Fast and tool-free mounting - perfect for the temporary and permanent installation.

Mechanical Locking End Plugs

Provide extra safety with a twist or lock mechanism that will keep the plug secured and prevent accidental removal.

Removable Designs

Facilitate smooth re-access for cable pulls and network upgrades.

Permanent Seals

Suggested in areas where no future access is foreseen.

Comparison: End Plug 110mm Jack Mount vs Standard Duct End Plug

FeatureEnd Plug 110mm Jack MountStandard End Plug
InstallationDesigned for jack mount and trenchlessGeneral use
Locking MechanismOften includes mechanical lockBasic push fit
Re-entryRemovable options availableVaries
Best ForTelecom & fiberSmaller or general ducts
Environmental SealHighModerate to high

Installation Best Practices

  • Clean the duct end thoroughly before installation

  • Ensure correct and full seating of the plug

  • Verify plug size matches exactly 110mm inner diameter

  • Use lubrication only if manufacturer recommends

  • Record plug placement for project documentation

Maintenance and Longevity

The End Plug 110mm Jack Mount, once installed, usually does not need any maintenance at all. It is made of materials that are very durable, even when buried, and that can withstand the moisture and temperature changes that are common in the Gulf Region.

Environmental Suitability for KSA & Gulf Region

The Gulf region has the following characteristics:

  • Extremely hot
  • Deserts with very low rainfall
  •  Salted coastal soils
  • A lot of sand and dust

The End Plug 110mm Jack Mount is specially designed to last in these conditions thanks to its use of UV-stable polymers, its moisture resistance, and its tolerance for chemicals. Thus, it is perfectly suited for the harsh environments of Saudi Arabia, UAE, Qatar, Kuwait, Bahrain, and Oman.

Compliance and Quality Assurance

While there might not be a single universal standard applied all the time, the End Plug 110mm Jack Mount is generally produced according to:

  • ISO quality control systems
  • ASTM property performance standards
  • Telecom and utility project requirements
  • Local city and infrastructure authority regulations

For compliance checking, it is always imperative to demand from your supplier material certificates, test reports, and conformity documents.

Handling and storage

  • Store in a dry, cool location

  • Avoid direct sunlight before installation

  • Stack plugs without crushing

  • Inspect visually before use

Buyer’s Guide: Choosing the Right End Plug 110mm Jack Mount

When selecting a jack mount end plug, consider:

1. Material Quality

Choose HDPE or elastomer variant based on environment.

2. Seal Type

Compression or integrated gasket for moisture exclusion.

3. Installation Method

Push-fit vs mechanical lock as per project needs.

4. Re-entry vs Permanent

Removable options for future access.

5. Environmental Conditions

UV, moisture, soil chemicals.

6. Supplier Credentials

Quality control certifications and warranty support.

Conclusion

The End Plug 110mm Jack Mount is a critical sealing component for protecting underground conduits in modern infrastructure deployments across Saudi Arabia and the Gulf region. Its reliable sealing capability, strong mechanical design, and compatibility with telecom, fiber, power, and utility systems make it indispensable in duct management and protection.

From pre-installation protection through cable pulling stages to long-term network operation, this end plug helps maintain duct cleanliness, enhance cable installation efficiency, prevent costly damage, and increase long-term service reliability. In harsh Gulf climatic and soil conditions, its durability and environmental resistance make it a trusted choice for contractors, engineers, and utility planners working on projects of all scales.

Frequently Asked Questions (FAQs)

1. What is an End Plug 110mm Jack Mount used for?
It seals the open end of a 110mm duct to protect against water, dust, rodents, and debris.

2. Can it be reused after cable installation?
Many designs are removable and reusable.

3. Does it require tools for installation?
Push-fit variants do not; some locking models may use basic tools.

4. Is the seal moisture-proof?
Yes, compression and elastomer designs provide moisture resistance.

5. Is it suitable for fiber optic projects?
Absolutely — it protects conduits prior to fiber blowing or cable pulling.

6. Can it be used in directional drilling installations?
Yes, it works well with jack mount and trenchless bore entries.

7. Does it resist Gulf climate conditions?
Yes — engineered for high temperatures, sand, dust, and moisture.

8. Is it approved for government projects in KSA?
When supplied with correct specs and certificates, yes.

9. Can the plug block rodent entry?
Yes — it acts as a physical barrier to pests.

10. Does it affect cable pulling operations?
No — once removed, the duct remains clean and ready for cable pulls.